Most damp in homes is condensation: moisture from cooking, washing and breathing that settles on cold surfaces because it has nowhere else to go. Insulation warms the surfaces, which helps. Sealing the house removes air changes it was relying on, which doesn't. So any upgrade that makes a home tighter has to come with a look at its ventilation.
The four kinds of damp have different cures
The government's damp and mould guidance, written for landlords in England and last updated in April 2026, describes four types. Condensation damp is the most common. Penetrating damp comes through the walls or roof from outside. Rising damp comes up from the ground. The fourth is damp from leaks and floods.
The guidance is direct about cause. It says it is unreasonable to blame damp and mould on tenants' "lifestyle choices", and that the root causes are building defects, inadequate ventilation, inadequate heating and poor energy efficiency. It estimates that between 4% and 27% of homes in England are affected, or 962,000 to 6.5 million households, depending on how damp is defined. The English Housing Survey, which counts only damp a surveyor judges serious enough to need work, found it in 5% of homes in 2024. Severe condensation was the most common form at 3%, ahead of penetrating damp at 2% and rising damp at 1%. Private rented homes had the highest rate, at 10%.
Ventilation only treats condensation. A leaking gutter or a bridged damp-proof course needs repair first.
Insulating and sealing change the balance
Uninsulated walls are cold on the inside, and cold surfaces collect condensation. The government's DEEP trial of 14 solid-walled homes found that the uninsulated homes were themselves at risk of surface condensation. Its synthesis report says solid wall insulation was the measure that reduced that risk most, though risks stayed at the places where insulation stopped until the whole house had been treated. Internal wall insulation brought a different risk, of condensation inside the wall behind the insulation, which loft, wall and floor insulation covers.
Sealing works the other way. The damp and mould guidance says energy efficiency work can reduce ventilation and that the two should be assessed together. England's Approved Document F turns that into a counting rule, which counts measures fitted in earlier years as well as those planned. A home that has had no major measures and up to two minor ones needs nothing more. Major measures are insulating more than half the external walls, replacing more than 30% of the windows and doors, sealing or insulating a suspended ground floor, and removing or sealing over a chimney. Past that threshold the guidance expects ventilation to be added. In the middle category that can be natural ventilation designed to the document's own rules, continuous extract or heat recovery ventilation. In the top category, natural ventilation is only an option when designed by an expert (2021 edition, paragraphs 3.8 to 3.12, Table 3.1 and Diagram 3.1; the 2026 edition, from 24 March 2027, keeps the same rule).
Approved Document F accepts following PAS 2035:2023, the BSI standard for whole-house retrofit, in place of the count (paragraph 3.7), and that standard goes a step further. Its Annex C treats signs of condensation or mould found during the assessment as enough on their own to require the retrofit designer to check the existing ventilation and, where it falls short, to specify an upgrade (clause C.2.1).
The main kinds of ventilation
Approved Document F sets out three systems for homes.
- Natural ventilation with intermittent extract. Trickle vents in the window frames let air in, and fans in the kitchen and bathrooms run when needed. This is what most existing homes have, or are meant to have.
- Continuous mechanical extract. Fans run all the time at a low rate, drawing air out of the wet rooms, either from one central fan or from a small fan in each room.
- Mechanical ventilation with heat recovery (MVHR). A ducted system supplies fresh air and extracts stale air, passing the two through a heat exchanger so the incoming air is warmed by the outgoing air. Under Approved Document F the existing background vents are sealed when it is fitted.
Positive input ventilation (PIV), a fan that pushes air into the house, is another product you may be offered. It is not one of the three systems set out in Approved Document F. If one is proposed as part of insulation work, ask how it will be shown to meet the Building Regulations.
Some details in the document are easy to check at home. Replacement windows should have trickle vents at least as large as the ones they replace (paragraph 3.14). Internal doors need a gap of about 10 mm above the finished floor so air can move from room to room (paragraph 3.27). When a kitchen or bathroom is refitted, existing extract fans and cooker hoods that vent outside should be kept or replaced (paragraph 3.30).
If a room has an open fire, a stove or a gas appliance, get advice from a registered installer before sealing anything in it.
A system only works if it is used. The 2025 Loughborough University review for DESNZ found that not knowing how to operate ventilation is one of the barriers to people using it, mechanical systems most of all. Ask for the controls to be explained at handover, and leave continuous fans switched on.
Humidity is worth measuring
A cheap humidity meter can show whether a room has a problem before mould appears. For new homes, Approved Document F treats its moisture standard as likely to be met if, in the colder months, a room's relative humidity averaged over a month stays below 65%, over a week below 75% and over a day below 85% (Appendix B, Table B3, the same in the 2021 and 2026 editions). Those figures are a check for new homes, not a legal limit for yours, but they make a sensible yardstick. A room that sits above 65% for weeks in winter is a reason to look at its ventilation and heating.
What social tenants and landlords in England should know
Awaab's Law has applied to social housing in England since 27 October 2025. The government guidance for social landlords, last updated in July 2026, sets these timeframes:
- emergency hazards investigated and made safe within 24 hours;
- significant hazards, which include significant damp and mould, investigated within 10 working days;
- a written summary to the tenant within 3 working days of the investigation ending;
- for significant hazards, work to make the home safe within 5 working days of the investigation ending;
- for significant hazards, begin, or take steps to begin, further work to stop the problem returning within 5 working days of the investigation ending; where that is not possible, physically start it within 12 weeks.
The first phase covered emergency hazards and significant damp and mould. The guidance says that in 2026 the duties will extend to hazards including excess cold and excess heat, and that in 2027 they will extend to all remaining hazards in the housing health and safety rating system, except overcrowding.
These timeframes apply to social landlords in England. If you rent privately, or live in Scotland, Wales or Northern Ireland, your council or a housing adviser can tell you what applies to your home. The damp and mould guidance itself is addressed to all rented housing providers in England, and its point about not blaming tenants applies to them all.
If you rent and report damp, do it in writing with dated photographs, and say which rooms are affected and whether the fans and vents work. Heat pumps in rented homes covers heating upgrades for tenants and landlords.