Ventilation requirements when you upgrade the fabric

How Approved Document F in England sorts insulation and glazing work into categories, what ventilation each category calls for, and what PAS 2035:2023 Annex C asks for on top.

Last reviewed 16 November 2026 6 min read8 sources

In England, Approved Document F gives a counting rule for energy efficiency work on an existing home. You list the measures, class each one as minor or major, and the total puts the job in category A, B or C. Category A needs no added ventilation. B and C do. The rule is in paragraphs 3.6 to 3.13, Table 3.1 and Diagram 3.1 of Volume 1, 2021 edition, which took effect on 15 June 2022. It sits under paragraph 3.2: when energy efficiency work affects the ventilation of an existing home, the ventilation should meet the standard or be no less satisfactory than before, and a note counts infiltration as part of the ventilation the home has.

This guide covers England. Wales, Scotland and Northern Ireland publish their own ventilation guidance, so on a job there, work from the local document.

Which measures are minor and which are major

Table 3.1 sorts measures by how much they are likely to cut infiltration.

Minor measures:

  • renewing loft insulation, including effective edge sealing
  • a loft conversion, or changing a cold roof to a warm roof
  • cavity wall insulation to any external wall
  • internal or external wall insulation to 50% or less of the external wall area
  • replacing 30% or fewer of the windows and doors
  • replacing a loft hatch with a sealed unit
  • sealing around service penetrations

Major measures:

  • internal or external wall insulation to more than 50% of the external wall area
  • replacing more than 30% of the windows and doors
  • sealing or insulating a suspended ground floor
  • removing or sealing a chimney

The suspended floor and the chimney are the two easiest to miss. Neither looks like a big job, and both count as major because of what they do to air leakage.

How the count sets the category

Category A is no major measures and up to two minor ones. No further ventilation provision is needed.

Category B is where ventilation is likely to fall below the requirement. The document gives three ways to respond: natural ventilation to paragraphs 1.47 to 1.59, continuous mechanical extract to 1.60 to 1.66, or mechanical ventilation with heat recovery (MVHR) to 1.67 to 1.73 with the existing background ventilators sealed.

Category C is where ventilation is likely to be reduced significantly. Continuous mechanical extract and MVHR are still available. Natural ventilation is only an option with expert design advice.

The line between B and C steps down as major measures are added. In Diagram 3.1, a job is in B with no major measures and three to six minor ones, one major and up to five minor, two major and up to three minor, or three major and no minor. Beyond those it is C, and four major measures is always C. The count includes measures fitted since the house was built, not only the ones planned now (3.8).

The simplified method is not the only route. Paragraph 3.7 also allows expert advice, which may include an air permeability test, and a note accepts following PAS 2035. Appendix D is a checklist for the ventilation already there.

Rules that apply to particular jobs

Replacement windows should have background ventilators at least as large as the ones they replace (paragraphs 3.14 and 3.15). Where the old windows had none, the default is 8,000 mm² equivalent area in habitable rooms and kitchens and 4,000 mm² in bathrooms. With continuous extract installed, habitable rooms need 4,000 mm². If that is not technically feasible, the guidance is to get as close as possible.

Adding a wet room calls for intermittent extract with a 5,000 mm² background ventilator, or continuous extract, or a single-room heat recovery ventilator (paragraphs 3.25 to 3.29). Internal doors need the equivalent of a 10 mm undercut on a 760 mm door, measured above the finished floor, or 20 mm above an unfinished one (3.27). When a kitchen or bathroom is refurbished, existing extract fans and cooker hoods should be kept or replaced and checked (3.30).

The system types the document sets out

Approved Document F describes natural ventilation with intermittent extract fans, continuous mechanical extract (centralised or decentralised), and MVHR. Positive input ventilation is not in that list.

  • Extract fansFans in the kitchen and bathrooms run when needed. Fresh air comes in through trickle vents.
  • Continuous extractQuiet fans run all the time at a low rate and boost when cooking or bathing. Often called MEV or dMEV.
  • Heat recovery (MVHR)Ducts supply and extract air through a unit that passes heat from the outgoing air to the incoming air. Suits an airtight home.
  • Positive input (PIV)One unit pushes filtered air in, usually from the loft, and stale air leaves through gaps and vents.
Intermittent extract fans, continuous mechanical extract, MVHR and positive input ventilation compared

The choice changes the heat loss calculation as well as the air quality. The MCS Heat Load Calculator documentation says it models continuous extract and MVHR at 0.5 air changes per hour and positive input ventilation at a supply of 20 m³/h, taken from SAP 10.2 section 2.6.1. If the fabric work moves the home into category B or C and a system is added, the ventilation term in the room-by-room calculation should be redone for the home as it will be.

Two findings from field studies bear on what gets installed. The DEEP trial concluded that "draught-proofing alone is not effective or long-lasting" and that an airtightness strategy belongs in every fabric retrofit. And the 2025 Loughborough review for DESNZ found that occupants' use of ventilation is hindered by not knowing how to operate it, mechanical systems most of all. A system the household cannot work will not do what the calculation assumes.

What PAS 2035:2023 Annex C adds

Annex C of PAS 2035:2023 applies wherever it is stricter than the national ventilation document, and it uses the Approved Document F categories. Where the measures fall in category B or C, or the assessment found condensation or mould, the Retrofit Designer confirms whether the existing ventilation is adequate and specifies an upgrade if not (C.2.1).

  • For category C, an acceptable complete system is continuous mechanical extract from every wet room with background ventilators in living rooms and bedrooms, whole-dwelling MVHR, or another system shown by expert advice to perform as well (C.2.2).
  • For category B, an existing intermittent extract system is also acceptable if it has correctly sized fans in every wet room and background ventilators in every room (C.2.3). A note warns that if the work may take air permeability below 5 m³/(h·m²) at 50 Pa, that may not be enough.
  • Where ventilation is upgraded, continuous extract or MVHR is the minimum unless a test shows air permeability after the work of at least 5 m³/(h·m²) (C.3.2, C.3.3). Background ventilators with continuous extract should be at least 4,000 mm² (C.2.2, note 1).
  • Continuous systems are demand controlled, responding to a measured parameter such as humidity, not only a light switch (C.3.6). Every habitable room gets purge ventilation, and air must be able to move between rooms (C.3.4).
  • The design includes calculations showing the specified rates are delivered (C.3.11), and installers are registered with a competent person scheme and approved by the manufacturer (C.3.12).

The assessment itself records every fan by type and model and every background ventilator by size and position (7.3.2). PAS 2035 and the retrofit process covers the wider standard.

The 2026 edition from 24 March 2027

The 2026 edition of Approved Document F takes effect on 24 March 2027 for most work, and on 24 September 2027 for work connected with higher-risk buildings. Section 3 keeps the method above with the same paragraph numbers, Table 3.1 and Diagram 3.1; only some cross-references into Section 1 change. Building Circular 01/2026 says the old rules still apply to work notified before 24 March 2027 and started before 24 March 2028.

Approved Document L links the two documents in both editions. Paragraph 0.22 of the 2021 edition, and 0.24 of the 2026 edition, say the infiltration of a dwelling should be considered when specifying purpose-provided ventilation. The note to 2021 paragraph 4.23 asks for particular attention to Approved Documents F and J when making an existing home more airtight.

Sources

What this guide relies on, and the date we read each one. Rules, prices and standards change, so check the source before you act on a figure.

  1. HM Government, Approved Document F Volume 1 Dwellings, 2021 editionassets.publishing.service.gov.uk, read 16 November 2026
  2. HM Government, Approved Document F Volume 1 Dwellings, 2026 editionassets.publishing.service.gov.uk, read 16 November 2026
  3. MHCLG, The Future Homes and Buildings Standards, Building Circular 01/2026gov.uk, read 15 November 2026
  4. HM Government, Approved Document L Volume 1 Dwellings, 2021 edition incorporating 2023 amendmentsassets.publishing.service.gov.uk, read 16 November 2026
  5. MCS, Heat Load Calculator reference sources, Ventilation ratesheatloadcalculator.mcscertified.com, read 15 November 2026
  6. BSI, PAS 2035 2023 Retrofitting dwellings for improved energy efficiency, full textbsigroup.com, read 16 November 2026
  7. DESNZ, Demonstration of Energy Efficiency Potential (DEEP) Synthesis Reportassets.publishing.service.gov.uk, read 15 November 2026
  8. Loughborough University for DESNZ, Gathering evidence to improve airtightness in the UK housing stock, project summary, Research Paper 2025/002assets.publishing.service.gov.uk, read 15 November 2026

Quick answers on this subject

Still have a question?Ask it and get an answer with sources. No sign-up needed.

Guidance only. It is not a substitute for a survey or a professional design for your home.