MCS now publishes its heat pump standards in two parallel sets. One belongs to the original installer scheme and the other to the redeveloped scheme, which the documents call "MCS: 2025". Which set applies to you depends on whether your certification body has moved you across yet. The MCS Complaints Policy gives the window: certification bodies move installers in phases from February 2026 until 31 March 2027.
What the redeveloped scheme asks of the business
The Installer Operating Requirements (Issue 2.0) and the Customer Commitment (Issue 1.1) are both dated 8 September 2026. You hold an Installer Agreement directly with MCS. The points that change day-to-day work are these.
- Assessment is risk-based. In your first two years expect at least one site-based assessment per certified technology each year, with fewer later if you stay compliant (3.14). Root cause and corrective action for a non-conformity are due within six weeks of the report (3.16).
- You share the Customer Commitment with the customer before they sign (6.2), enter their contact details on the certificate so MCS can contact every customer (6.3), and follow MCS's technology handover checklists (6.4).
- The MCS certificate goes to the customer within 30 calendar days of commissioning (glossary).
- You give a written guarantee for design and workmanship and an MCS-approved financial protection (6.10, 6.11), take part in the MCS complaints process, and accept alternative dispute resolution with a provider MCS appoints and funds (6.8, 6.9).
Under the redeveloped scheme, MCS no longer requires consumer code membership (Complaints Policy, section 2.5). For the Boiler Upgrade Scheme, Ofgem's installer guidance V5.2 lists the redeveloped MCS scheme as an approved consumer code, so an installer who has moved across does not need separate RECC or HIES membership. An installer still on the original scheme must keep RECC or HIES membership (paragraphs 2.12, 2.20 and 2.21). See grant funding for installers.
The current documents, issues and dates
| Document | Issue | Date | What it covers |
|---|---|---|---|
| MIS 3005-D (original scheme) | 3.0 | 5 December 2025 | Design, pre-sale information, handover |
| MIS 3005-D:2025 | 2.0 | 5 December 2025 | Design under MCS: 2025 |
| MIS 3005-I:2025 | 1.0 | 1 January 2025 | Installation and commissioning |
| MCS 031 a) (original scheme) | 5.0 | 5 December 2025 | Hydronic pre-sale estimate |
| MCS 031 a):2025 | 2.0 | 5 December 2025 | The same estimate under MCS: 2025 |
| MCS 031 b) | 1.0 | 5 December 2025 | Air-to-air estimate |
| MCS 020 a) | 1.1 | 14 April 2025 (footer) | Sound calculation for permitted development |
| MCS 007 | 8.0 | 5 December 2025, mandatory from 5 December 2026 | Product standard |
| MGD 007 | 1.0 | 14 July 2021 | Reference data, emitter guide, cylinder selection |
MCS 020 a) prints 14/04/2024 against Issue 1.1 in its amendment table, a year before Issue 1.0 came out on 20 March 2025, so the table uses the footer date. MCS 007 Issue 8.0 added air-to-air criteria and replaces Issue 7.0 of April 2025.
The design rules both sets share
Both MIS 3005-D documents cover single heat pumps up to 45 kWth, and several up to 70 kWth total design heat load with none above 45 kWth.
- Heat load, MIS 3005-D:2025 §3.4.1(a) (Issue 3.0 §5.5.1(a)): BS EN 12831-1:2017, internal temperatures not below Table 1, external temperatures from Table 2 at 99% or 99.6%. At 99.6% no intermittent heating uplift is needed.
- Sizing, MIS 3005-D:2025 §3.4.1(e) (Issue 3.0 §5.5.1(e)): at least 100% of the heat load at the flow temperature, without any supplementary electric heater.
- Hybrids, MIS 3005-D:2025 §3.4.2(d) (Issue 3.0 §5.5.2(d)): all sources together at least 100%, the heat pump at least 55%, rated at 55°C flow at the design external temperature.
- Air-to-air, MIS 3005-D:2025 §3.4.3 (Issue 3.0 §5.5.3): outdoor capacity at least 100% of the building load, an indoor unit in every habitable room, each sized for at least 100% of that room's load.
- Above 55°C, MIS 3005-D:2025 §3.4.5 (Issue 3.0 §5.5.5): offer a 55°C or lower alternative design and explain the difference so the customer can choose.
- Hot water, MIS 3005-D:2025 §3.5.2 (Issue 3.0 §5.6.2): 45 litres × N, where N is the greater of bedrooms plus one and known occupants.
The method is in room-by-room heat loss and design temperatures and sizing.
Where the two design standards differ
The redeveloped set moves customer-facing duties out of the design standard and into the Customer Commitment and MCS 031 a):2025, so some clauses exist only in the original-scheme document.
- Pre-sale. Issue 3.0 section 4 requires the estimate and Key Facts before contract, and says the EPC's annual heat demand is not appropriate for sizing. MIS 3005-D:2025 has no such section; MCS 031 a):2025 §2.1 carries the same sizing caution.
- Timescale. Issue 3.0 §5.1.1 wants the design complete within 60 calendar days of contract. MIS 3005-D:2025 sets no time.
- Reheat time. Issue 3.0 §5.6.4 has the cylinder reheat time agreed with the customer. MIS 3005-D:2025 §3.5 has no matching clause.
- Design information. Before installation it goes in writing to the customer under Issue 3.0 §5.9.2 and to the installer under MIS 3005-D:2025 §3.8.1.
- Handover. Issue 3.0 sections 7 to 9 cover the handover pack, registration within 10 working days of commissioning, maintenance and competence. MIS 3005-D:2025 stops at design.
How the MCS 031 a) estimate is built
MCS 031 a):2025 and Issue 5.0 use the same method. Space heating and hot water demand and floor area come from a valid EPC. With the postcode's degree days and outdoor low temperature, the space heating demand gives an indicative heat loss, and its specific heat loss selects a band in the lookup table. The SPF is read from that band at the proposed flow temperature, and where existing radiators are kept the default is 60°C unless a room-by-room calculation justifies lower. Hot water demand is divided by 1.9, or 2.2 for hot water from a ground source heat pump. Any immersion pasteurisation is added, and the total is shown as a range of plus or minus 10%. Both issues raised the hot water factor from 1.7. MCS 031 b) covers air-to-air heat pumps in heating mode. More in SCOP, SPF and performance estimates.
Products, tools and stale references
MIS 3005-D:2025 §3.3.1 requires the heat pump to be listed on the MCS website, the stated source for SCOP and for the 55°C capacity in the hybrid rule. MCS updated its Heat Load Calculator in April 2026, adding 99.0% design temperatures alongside 99.6% and withdrawing the old Excel calculator. MCS says calculations done with it will be compliant, not that it is mandatory. MCS 020 a) is covered in noise assessment and planning rules.
The reading lists in MIS 3005-D Issue 3.0 (December 2025) and MIS 3005-I:2025 cite BS 7671:2018+A1:2020; electrical supply and DNO notification gives the amendment in force. MIS 3005-I:2025 still lists "MCS 021 - Heat Emitter Guide". The emitter guide is now section 4 of MGD 007, which is guidance; MIS 3005-D does not require a star rating. Before quoting a clause, check the issue number on the document itself.